Menu

LONRIHEAT APPLICATIONS

CEMS Heated Sample Lines

Configure heated sample lines with PTFE, FEP, PFA, stainless steel or copper tubing, and constant-wattage or self-regulating heating options.

Black insulated sample-line assembly connecting a sampling point to an analyser cabinet
Application illustration; not a photograph documenting a LONRIHEAT installation.
IndustrialOEM & Custom

Application and low-temperature risk

Sample transport must be reviewed for condensation, material compatibility and the conditions at the analyser interface.

Equipment or areas to review

Gas composition, dew point, target sample conditions, tube count/material/bore, route length, pressure/flow, purge/calibration lines, power and end fittings. Identify each heated zone and the unheated interfaces.

Define the design objective

Distinguish freeze protection, temperature maintenance, heat-up and anti-condensation. State the required condition and operating schedule; each duty needs its own heat balance and acceptance basis.

Compare heating technologies

Review the complete sampling tube + heat tracing + insulation assembly, including sample path, terminations, routing and control interface.

Product selection scope

Use the linked product families to compare construction, interfaces and configuration-specific documents. Final model, supply, output, length, temperature limits and accessories must match the proposal.

Controls and sensing

Define sensor location/type, controller logic, zones, startup/load current, protection, alarms and any independent limiter. Agree integration and monitoring responsibilities.

Electrical, environmental and area requirements

Specify destination market, electrical supply, moisture/corrosion, mechanical exposure and any hazardous-area or system-specific approval requirements. Verify the exact configuration and document scope; no site approval is inferred.

Installation structure

Confirm routing, minimum bend and movement limits, support, strain relief, end connections and electrical interfaces using the offered assembly drawing and instructions. Preserve access to fittings and controls.

Design input parameters

Gas composition, dew point, target sample conditions, tube count/material/bore, route length, pressure/flow, purge/calibration lines, power and end fittings.

Testing and delivery evidence

Request the proposed data sheet, layout/dimension drawing, wiring and control diagram, installation instructions, component schedule and applicable test or compliance documents. Agree document revision, commissioning records, acceptance criteria and responsibility.

Common purchasing errors

Do not select from nominal W/m alone, treat maximum exposure as maintain temperature, mix configuration limits, omit cold points or substitute one component approval for complete system evidence.

Relevant product families

Heated sample tube bundle configurations with visible sample tubes, insulation and heating elementsHeated Sample Lines for CEMSComplete sample-tube, heat-tracing and insulation assemblies for CEMS and process sampling. Match the sample conditions and analyser interfaces before defining the bundle.

Related answers, products & documents

revision
MARKET-APPLICATIONS-20261119-V1
updated
2026-11-19

Industry pathway: Chemical processing →

Industry pathway: Steel & metallurgy →

Industry pathway: Power generation →

Additional application details

Problem and design purpose

Preserve sample transport conditions to the analyser.

Required inputs

Composition, dew point, tube material/count/diameter, length, pressure/flow, fittings, supply and control.

System architecture

Define heater, supply/protection, controls/sensors, terminations, fixing, insulation and access.

Risks and limitations

Tube, heater, insulation and interfaces require whole-assembly review.

Verification and handover

Retain the selected configuration, conditioned output/limits, accessory schedule, drawing, installation/test plan and destination-market documents. Agree open inputs and responsibility.

Buyer review checklist

How can we prevent condensation in our sample line? How do I choose the tube material, number of tubes and SR or CW heating for a sampling bundle?

Heated sampling tube bundle — configuration checklist

Specify sample composition, dew point, required transport temperature, sample-tube material/quantity/bore, tube length, purge or calibration lines, ambient/wind exposure, pressure, analyser connections and controller. A leak-test pressure is not a continuous working-pressure rating. Submit these conditions with quantity, destination and the requested technical documents for a configuration-specific proposal.

See how the heating fits the application

1 Media / sample path
2 Heater + temperature sensing
3 Thermal insulation
4 Protective jacket + end interfaces
Installation / configuration principle. Define the media path, heating, sensing, insulation and end connections together. Use the proposed assembly drawing to confirm configuration and limits.

Review the physical product and interfaces

These supplied product photographs show physical examples. Application suitability, exact specifications and compliance remain specific to the offered configuration.

Heated sample tube bundle configurations with visible sample tubes, insulation and heating elements
  1. Sample tubes: white polymer tubes
  2. Heating element
  3. Outer protective jacket
  4. Thermal insulation
Supplied product photograph
Supplied sampling-bundle configuration photograph prepared on a white background. Tube count, materials and dimensions depend on the selected assembly.
Heated Sample Lines for CEMS →

RFQ technical information

Share what is known and identify missing inputs. Submission requests a technical review; it does not establish a final design or approval.

Application / equipment
Describe the duty and attach a drawing
Design conditions
Gas composition, dew point, target sample conditions, tube count/material/bore, route length, pressure/flow, purge/calibration lines, power and end fittings.
Supply / control
Voltage/frequency, zones, sensor/controller and protection
Commercial / evidence
Company, email, quantity, destination, timing and required documents

Application FAQ

Can this application be selected from one temperature or power figure?

Define the complete design basis and interfaces first. Maintain temperature, exposure conditions, supply, geometry, insulation and controls must be assessed together.

Do the linked products prove approval for this application?

No. Verify the proposed model and complete configuration against its documents and the destination requirements. A product-family link is a selection path, not an application approval.

What should I send for engineering review?

Gas composition, dew point, target sample conditions, tube count/material/bore, route length, pressure/flow, purge/calibration lines, power and end fittings. Include drawings/photos, quantity, destination and the requested deliverables; mark unknown inputs.

Get selection or project review

Results from preliminary tools are for reference and recommendations only. Final quantities and specifications must follow the engineer-approved design.

Open the preliminary quantity estimator · Contact the export team